The Interdisciplinary Science & Engineering Complex (ISEC) building at Northeastern University was completed in 2017, while the EXP Building is currently under construction, and scheduled to be completed in early 2023. The ISEC Building is a 234,000 SF Laboratory & Research building, which earned LEED Gold in 2018. It consists of classrooms and laboratories designed for collaboration and research. The EXP Building is a 350,000 SF Research Facility and is located next to the existing ISEC building on the Northeastern campus.

Project Highlights

  • Application: Airflow Valves and Fume Hood Control
  • ISEC – 400+ AccuValves
  • EXP – 475+ AccuValves
  • Fume Hood Control – 130+ at ISEC & EXP
  • AVC Series AccuValves for ease of control for BMS and demand static pressure reset